C3D ATLAS™Project inspection planning and execution is one of the most vital activities in any construction project. C3D ATLAS was designed to manage the entire project completion process from the building inspection’s scope of work to manag-ing inspection activities, system walk-downs, and punch lists during each project phase (from start to completion). C3D ATLAS enables users to manage and report on inspection activities using BIM-based interface. C3D ATLAS is used to successfully handover plants, buildings, and infrastructure facilities. Build Your Scope
C3D ATLAS offers an easy-to-use
interface that defines all the required tasks and forms so you can
build the inspection scope in different project phases
(construction, pre-commissioning, commissioning, and start-up).
System setup starts the definition of the ref-erence data such as
project phases, disciplines, categories, tags (process and
non-process), and the QC Forms required for handover. Accordingly,
Atlas automatically generates the scope of work for inspection. The
scope is presented in a hierarchy that shows the different systems,
their subsystems, tags, and all ITP/ QC forms required for handover
at differ-ent levels of the hierarchy. This ena-bles early
definition of the scope of work. Having the scope of work ready, or
partially ready, means day-to-day activities (inspections and
walk-downs) can start.
Build
scopes and raise AFI’s visually
Start Inspecting
Inspections start with the issuing of
an Application for Inspection (AFI) . Based on the construction
activity at hand, the QC department creates QC inspec-tion forms and
selects which team members (inspectors/engineers) will perform and
attend the inspection. These professionals are sent the AFI details
(date, time, and location) through Atlas’s workflow engine. The
inspection results are noted on the generated QC forms which are
then signed by the inspection team. Inspec-tion results are entered
into C3D
ATLAS alongside scanned copies of the forms and
their related documents. Lab testing results are also tracked in the
system.
Walk-downs to Completion
C3D
ATLAS also manages the Walk-down process. The
walk-down results, punch-list items, and the observations noted
are handed over to the punch-list coordinator. Accordingly,
electronic walk-down forms are updated in Atlas with the added
advantage of having the scanned walk-down forms with all the
required signatures attached.
Room
Completion Module
Fill Forms the Way You Want
In addition to filling inspection
findings directly through C3D
ATLAS’s user friendly interface, digital pens with
specially printed forms can be used for inspections requiring
the use of a paper trail. The handwriting on the forms is
captured by the digital pen, and automatically extracted
and sent to Atlas.
Report and Monitor Progress
C3D
ATLAS is preloaded with a rich set of reports
that empower project teams and management with monitoring tools
that keep them up-to-date. Re-ports show inspection progress and
punch-list status (by system, disci-pline, area, etc.). Reports
come in vari-ous formats including grid reports, pivot tables,
and even interactive dashboards. Progress and punch-list
tracking can be monitored interactively in a 3D/BIM based
environment.